Mathematical Model of the Váh Cascade
Keywords:
ELECTRICAL SUPPLY SYSTEM, OPTIMAL OPERATION, HYDROPOWER PLANT, OPTIMIZATION CRITERION, OPTIMAL PROGRAMMING, SIMULATION MODELAbstract
The optimal operation of an electrical power supply subsystem results from respect for the effectiveness criterion for the control of an industrial enterprise. It is essential for the operation of the SE-VET – a significant hydro-energy system. The fundamental principle of this operation is the potential hydropower utilization of water courses of the SE-VET in addition to planning the control of SE system.Downloads
Published
2012-05-24
Issue
Section
Generation of Electricity, Transmission, Distribution and Consumption of Electricity